Pages Navigation Menu

Sliding Angle Mast Conversion

This is a Schramm T450GT that had the following repairs done:

  • Converted from conventional vertical drilling to sliding angle mast for mineral exploration.
  • Installed front platform for tram controls.
  • Installed cyclone with swing out mount, wet splitter, booster piping, and mud mixing hydraulic circuit.
  • Sand blasted and painted.