Pages Navigation Menu

Rig Turnover Repaired

Remember this rig

We were there to turn it back over and restore it to it's like-new condition. It just was released back into the well drilling world with the following replacements:

  • Mast Assembly
  • Pullout walkway
  • Oil Cleaners
  • Exhaust System
  • Carousel
  • Shaft in rotation gearbox

And finally, it was sandblasted and painted.

 

Below you can watch a quick video of the mast being placed back on the rig